
Detail Engineering at SNC LAVALIN– Andheri (Mumbai)
Complete Shedgum-Yanbu Gas Pipeline Loop 4&5 – Isometrics Preparation Checking & Issuing at SNC LAVALIN– Andheri (Mumbai) – 9000 man-hours
BARC Crecst –Vizag – Detail Engineering for Piping & Civil for all utility blocks & testing units in 3D Model of PDMS, Preparation of 3d model, Extraction of Piping Layouts, Equipment Layouts Sections , Structural Fabrication Detail Dwgs, etc. L&T Nuclear Division – Powai for BARC
Complete Shedgum-Yanbu Gas Pipeline Loop 4&5 – Isometrics Preparation Checking & Issuing at SNC LAVALIN– Andheri (Mumbai) – 9000 man-hours
Manpower Deputation of Designers & Engineers at Techint India Pvt Ltd- Mumbai Location
Chemicals & Resins Pvt. Ltd. (Vopac Int. Ltd.) @ old Kandla-Kutch Gujrat Scope Of Work : Preparation of As Built Dwgs. Revamping of Existing facilities which includes areas such as Loading Unloading Road Gantries & Manifold Junctions. – 50000 man-hours
Preparation of Equipment layout plan & Sections , Piping Layout, IBR Isometrics Dwgs, Civil Pipe Support, Special Support Sketches, Bill of Material, Isometric with Mto etc. for Reactor area – Gargi Huttenes & Albertus (P) Ltd – Khopoli, ( Raigad ) – 12800 man-hours
Satyam Engineering Services is a specialist design Engineering team in detailed engineering and project management consultancy, providing services to Chemical, Petrochemical Refinery, Fertilizers, Oil & Gas Projects. SES is a team of young, efficient, qualified and hardcore professionals with a broad spectrum of consultancy and industrial background.
Complete Shedgum-Yanbu Gas Pipeline Loop 4&5 – Isometrics Preparation Checking & Issuing at SNC LAVALIN– Andheri (Mumbai) – 9000 man-hours
Manpower Deputation of Designers & Engineers at Techint India Pvt Ltd- Mumbai Location
Ⓒ 2011-2025 – All Rights Are Reserved